Tuesday, August 18, 2015

Silt Enforcement Hypothetical




Suppose there are 8,000 active residential construction sites in southeastern Michigan this spring, summer and fall, all on average-sized city lots, all having excavations for basements with the corresponding piles of dirt.  Also suppose that there are 3,000 large commercial, industrial, public works or utility projects, each having disturbed the soil to a significant extent.

Further, let’s assume that on half of all such construction sites, no erosion controls have been applied, and on the other half, silt fence has been installed but not maintained; and after being run over by trucks, front-end loaders, skyhooks and the like, the silt fence no longer functions.

Say the weather is in the typical range with three major rainstorms over the construction season at any given site.  Assume further that during each of those heavy rains, each residential lot loses one ton of loose soil (equivalent to a pickup truck load) in runoff which flows into sewers, and each of the large commercial, etc., projects loses three tons.  Then, after three heavy rains, a total of 51,000 tons (51,000 pickup truck loads) of dirt have gone into sewers.

Unlike many cities the size of Detroit or larger in the past decade or so, insolvent Detroit was not required to build a huge tunnel to hold billions of gallons of storm runoff for gradual release, screening, settling and treating.  

Instead, in our region, a deluge that causes silt-laden water to surge from construction sites into sewers also causes the sewers and a handful of small retention basins to overflow into local ditches and streams, which feed international treaty waters like Lake St. Clair, the Detroit River and Lake Erie.

That means, in our hypothetical, during each construction season, 51,000 tons of eroded soil clog the sewers, cloud our natural waterways, and fill the bottoms of rivers, harbors and lakes with sediment.

Image result for vactor 2100Silt fence at Lowe’s costs construction contractors around $30 for a 100’ roll. (Two or three well placed rolls would probably suffice on most city lots).  Thus, if local (county or city) erosion control enforcement agencies forgo strict requirements for silt fence (paid for by contractors) in preference for county or city sewer vacuum trucks like the Vactor 2100 (at $350,000 to $400,000 each) to suck the mud out of sewers, the needless cost to taxpayers is inexcusable.  


Something’s wrong with this picture.

[Readers: Got better numbers?  Leave a comment.]

Wednesday, December 10, 2014

A Peek Inside MDEQ's FOIA Process

A recent FOIA inquiry had to do with the state's double standard for the control of silt runoff from urban construction sites, about which a number of posts have appeared on this blog. My emails below were sent on Monday, December 8, with copies to various MDEQ officials and the Governor's office.
***   ***   ***

Environmental Assistance Center: 
On November 12, 2014, I made a FOIA request to the MDEQ FOIA Coordinator.  The coordinator's initial response is below, as is my email to her today.  Please assist me in determining what's going on in your department and when I can expect compliance with the Michigan Freedom of Information Act.
 -- Jim Lang 
*****   *****   ***** 
Dear Mr. Lang:  
SUBJECT:  Request for Disclosure of Official Files  
This notice is issued in response to your request for information under the Freedom of Information Act, 1976 PA 442, as amended (FOIA), received on November 13, 2014. You have requested information that you describe as “A rationale for the difference between the strict water quality and erosion control enforcement in MEAs and the lax enforcement by OCWRC in its role as CEA, as that rationale relates to Michigan waters and the public trust.”  
Please refer to the following tracking code if you have any questions: FOIA 0832-15.  
Your request will be forwarded to the following divisions: WRD*  
You will be contacted by the division(s) on or before: 11/20/2014  
The Department of Environmental Quality (DEQ) provides online access to several databases that may contain the information you need.   Please click here for the website. 
[signature omitted] FOIA Coordinator  
Department of Environmental Quality 
800-662-9278 
deqfoia@michigan.gov  
*****   *****   *****
Ms. [coordinator's name omitted]:
To date [12-8-14], I haven't  received any mail of any kind concerning FOIA Request #0832-15 from your Water Resources Division, contrary to your statement on December 3d, "the information was sent from WRD yesterday." 
I believe your false representation and WRD's failure to comply with the your first response and the statute qualify as a denial.  I'll proceed as I think most appropriate.
 -- Jim Lang

***   ***   ***
Tomorrow: MDEQ responds